Epping Private Hospital Day Surgery and Inpatient Unit

Client
Healthe Care

Architect
Health Science Planning Consultants

Building Engineering was involved with this project for repeat clients Healthe Care Australia from the outset, from ECI stage, delivering an early works package, through to delivering the completed facility under a Design and Construct contract. Stage one included the early works, demolishing the existing tenancies on level one. Stage two comprised the bulk of the D&C package spread over ground floor and level one. Ground floor works included installing medical gas cages, compressors and pumps, installation of a new generator and construction of a new ambulance canopy for the main entry. Level one fit out works comprised of 3 operating theatres, 1 endoscopy theatre, pre-op wait, hold and interview, CSSD facility, sterile store, 16 bay stage 1 and 2 recovery area, 24 bedrooms with ensuites including 1 isolation bedroom and 3 sleep lab bedrooms. Non clinical elements include main reception and waiting area, consulting rooms, staff lounge and change facilities, pharmacy store and commercial kitchen. All works were completed in a live environment setting.