Penleigh and Essendon Grammar School Middle Boys School
Client
Penleigh and Essendon Grammar School
Architect
McBride Charles Ryan Architecture & Interior Design
Construction of the New Boys Middle Campus at the Keilor Campus created a functional space both inside and outside, catering for the growing needs of both staff and students of Year 9.
Works comprised construction of a new two level classroom building linking to the existing structure and the refurbishment of existing science labs. Included in the new facility design is a feature staircase, constructed from in-situ concrete utilising Class 1 formwork raking and protruding from many angles.
Some key features include: BMS System throughout new and existing, AV cabling and interactive equipment, CCTV and alarm system, passenger lift, detailed interior finishes, multiple façade materials, acoustic meeting rooms, custom workstations, new amenities, external courtyard.
Works comprised construction of a new two level classroom building linking to the existing structure and the refurbishment of existing science labs. Included in the new facility design is a feature staircase, constructed from in-situ concrete utilising Class 1 formwork raking and protruding from many angles.
Some key features include: BMS System throughout new and existing, AV cabling and interactive equipment, CCTV and alarm system, passenger lift, detailed interior finishes, multiple façade materials, acoustic meeting rooms, custom workstations, new amenities, external courtyard.