![The Knox School Cladding Replacement](https://www.buildingengineering.com.au/wp-content/uploads/2023/02/Bldg-Eng-The-Knox-School-Cladding-Replacement-01-768x512.jpg)
![The Knox School Cladding Replacement](https://www.buildingengineering.com.au/wp-content/uploads/2023/02/Bldg-Eng-The-Knox-School-Cladding-Replacement-01-768x512.jpg)
St Kevin's College
Toorak
Completed in 2021
Akritidis Group Building Consultants
The St Kevin’s College project consisted of the removal of ACP cladding of a school sports hall and pool.
The cladding was replaced with solid aluminum cladding, including a colour change to freshen the building.